Rutba

Planning

Available now

Ships with Rutba Manufacturing

Demand and forecasts, the master schedule per branch, the time-phased MRP run, planned orders with pegging, firming, exceptions and the production timeline.

What's inside

Every screen in Planning

14 screens, listed the way the app's own menu lists them. This is what you see after signing in, not a feature list written for this page.

Main menu

  • Home
  • Forecasts
  • Demand
  • Master Schedule
  • MRP Runs
  • Planned Orders
  • Timeline
  • Exceptions
  • Work Centres
  • Calendars
  • Capacity Load
  • Schedule
  • Plants
  • Planning Policies

Rutba AssistantComing soon

Ask Planning about your own records.

The Ask button sits in Planning's top bar. It answers from your records as you (seeing only what your role in Planning already shows you) and lists what it read, so the answer can be checked.

How Rutba Assistant works →
  • The Planning agent

    Keeps a question inside Planning.

  • The Manufacturing agent

    Asks across Maintenance, Manufacturing, Planning, Quality and Shop Floor.

Ships with

Rutba Manufacturing

From the bill of materials to the bench that builds it

Versioned bills of materials with work centres on every routing step, a regenerative MRP run that nets against real inventory and pegs plan to demand, and a shop-floor terminal that reports work in progress from the bench where it happens.

From $15 per user / month. One plan covers every app in Rutba Manufacturing. See plans →

Also in Rutba Manufacturing

  • Work orders and the job cards under them, bundles, the materials issued against them, and the people paid by the piece for them. Bills of material carry versions, effectivity and the release that pins what the floor will build.

  • The operator terminal on a shared device: clock on by PIN, take the dispatch list for the bench, start and stop an operation, report output and downtime, offline if it has to be. There is also an andon board the floor reads from across the room.

  • Inspection plans and the inspection queue, holds, non-conformances, corrective actions, supplier quality and certificates.

  • Machines on the asset register, meters, preventive schedules, and requests and orders with parts and labour.

Try Planning with Rutba Manufacturing

Start on your own, or tell us what you run today and we will show you what moving across looks like.

Share this

One family

The rest of Rutba

One account across all of it. Sign in once and the products know each other.

PORTAL-SUITES-DETAIL · 2e7a24c